44
OPERATING PROCEDURES
:
Operating Procedures
2.4.2
Operation in the Mini Lab system
■
In the Mini Lab system, data is controlled by the Ice 900 as data server.
■
Connect the Ice 900, LT-900, and ME-1000 to configure the system.
■
Before blocking, load the traced data or JOB/PTN data, then set processing conditions and enter
layout data. Trace with the LT-900.
1
Turn on (
|
) the power switch to activate the Ice 900.
For starting procedures, see “2.2 Getting Started and Exiting” (page 33).
2
Load the traced data or JOB/PTN data to the Layout screen.
z
When tracing with the LT-900 tracing unit
1) Trace frames or pattern with the connected LT-900.
2) After tracing, press the
button on the Layout screen. After tracing, the traced
data is automatically transferred from the LT-900 to Ice 900 and displayed on the Layout
screen.
z
When loading JOB or PTN data saved in the Ice 900
1) Press the [Data] tab to display the Data Control screen on the Layout screen.
2) Select a file from the Data Control screen.
For details, see “2.3.3 Loading JOB data saved in the Ice 900” (page 36).
3
Set processing conditions.
For confirmation procedures, see “2.5.1 Setting processing conditions” (page 51).
Ôòáãå
Ôòáãåò
• When blocking only R (Right) lens with the initial screen is set to L (Left), press the L (Left)
button to switch the screen to R (Right) lens display.
Processing conditions and layout