104
OPERATING PROCEDURES
:
Daily Checks
2.10 Daily Checks
■
Check the following before and after every use each day. Be sure to perform check after use.
■
It is recommended that a checklist is prepared and the check results are recorded.
{
Check before use
1) Are there any apparent deformations or dirt which might interfere with proper operation?
Especially confirm that there are no foreign substances and dirt on the lens table.
2) Does the Layout screen appear when the instrument is started?
3) After loading the lens shape and setting the lens, does the blocking arm move properly
by pressing the blocking start
button?
{
Check after use
1) Is the power turned off?
2) Is the Ice 900 dirty or damaged?
3) Are all the accessories accounted for and free from damage?
Operator’s manual: 1 volume
Power code: 1 unit
Communication cable: 1 unit
Touch pen: 1 unit
Lens table (for Shape Imager): 1 unit
Small-diameter lens holder: 1 unit