NovaScale R620 User Guide
Sample screen of ESMPRO Manager 2
[Maintenance] screen of
IO
module
[PCI Module] – [Maintenance]
Procedure in the Server Maintenance Utility
Start
1.
Select the target component by using the Server Maintenance Utility.
2.
Check the current state of the target component with the LEDs.
3.
Click the [Up] button of the target component.
A certain time is required for the start.
The start result can be confirmed by the LEDs on the target component. The result of the start operation is
registered in the event log.
CHECK:
When starting a stopped IO module, diagnostics of the CPU/IO modules are automatically performed. The
IO module is started after the diagnostics.
Stop
Stop before replacing components.
1.
Select the target component by using the Server Maintenance Utility.
2.
Check the current state of the target component with the LEDs.
3.
Click the [Down] button of the target component.
A certain time is required for the start.
The start result can be confirmed by the LEDs on the target component. The result of the start operation is
registered in the event log.
CHECK:
When stopping IO module, check that the status of Ethernet is “Duplex” on Server Maintenance Utility. Do
not stop the IO module especially when LAN is connected only to the IO module on that side.
5-53
Summary of Contents for Bull NovaScale R620 Series
Page 1: ...User s Guide Bull NovaScale R620...
Page 2: ......
Page 17: ...NovaScale R620 User Guide Water cooling kit 1 4...
Page 74: ...NovaScale R620 User Guide 7 Configure the mirror of the extended volume 3 15...
Page 122: ...NovaScale R620 User Guide Exit Move the cursor onto Exit to display the Exit menu 4 23...
Page 345: ...This page is deliberately left empty...
Page 346: ......