Section 75
00-02-0878
2013-03-07
- 45 -
AMF MB Opening (Parameters 7060
–
7066 U Mains Failure)
It is possible to select the functionality of the mains breaker closing function. This is
necessary if the unit operates in Automatic Mains Failure (AMF).
The possibilities are:
Selection
Description
Start engine and open
mains breaker
When a mains failure occurs, the mains breaker opens, and the engine starts at
the same time.
Start engine
When a mains failure occurs, the engine starts. When the generator is running
and the frequency and voltage are OK, the MB opens and the GB closes.
AMF Timers
The time charts describe the functionality at a mains failure and at mains return. The
timers used by the AMF function are indicated in the table below:
Timer
Description
Parameter Number
t
FD
Mains failure delay
7070–7074 f mains failure
7060–7066 U mains failure
t
F/U
Frequency / Voltage OK
(
t
V/F, Voltage / Frequency/ OK)
6220 Hz/V OK
t
FOD
Mains failure OK delay
7070–7074 f mains failure
7060–7066 U mains failure
t
GBC
GB ON delay
6230–6232 GB control
t
MBC
MB ON delay
7080–7085 MB control
Example 1:
Parameter 7065 Mains fail control: Start engine and open MB
NOTE:
The Terms:
t
F/U (Frequency / Voltage) and
t
V/F (Voltage /
Frequency) represent the same value.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...