Section 75
00-02-0878
2013-03-07
- 174 -
Output
Description
Notes
Set parameter 2
Set parameter 3
Set parameter 4
Select test type to simple
Test sequence selection.
Select test type to full
Block GB sequence
Block the operation of the genset breaker.
Select application 1
Power management: Four different applications can
be stored at the same time in the units. Here the
selection between them can be made.
Select application 2
Select application 3
Select application 4
Run my ID
Runs the connected mains
Run one mains
Run one mains only
Run all mains
Run all mains in application
Update mode local
Running mode update.
Update mode on all
Running mode update
Store common settings
Broadcast the common settings to all units.
Open GB
Generator breaker.
Close GB
Open MB
Mains breaker.
Close MB
Start and close GB
Start the engine and close the breaker/open the
breaker and stop engine.
GB open and stop
Auto start/stop
ON = Start, OFF = Stop.
Remote start
Pulse signal.
Remote stop
Pulse signal.
Deactivate base load
Disables the base load function.
First priority
Forces this unit to have the first priority in a power
management system.
Select 3-phase system
Selects to measure AC voltage on a 3-phase system.
Select split L1 L3 phase system
Selects to measure AC voltage on a 2-phase system.
Select split L1 L2-phase system
Selects to measure AC voltage on a 2-phase system.
Select single phase system
Selects to measure AC voltage on a 1-phase system.
Idle run low speed
Idle speed constant low speed.
Idle run temp control
Idle speed temperature-dependent.
Cool down threshold
Interrupt cool down sequence.
Activate all AOP-2 buzzers
All AOP-2 buzzers.
Activate all AOP-2 relays
All AOP-2 relays.
Activate relay on
AOP-2 ID1
Single AOP-2 relays.
Activate relay on
AOP-2 ID2
Activate relay on
AOP-2 ID3
Activate relay on
AOP-2 ID4
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...