Section 75
00-02-0878
2013-03-07
- 94 -
Text in Status Line
This table explains the different messages in the status line text.
Condition
Comment
Note
BLOCK
Block mode is activated
SIMPLE TEST
Test mode is activated
FULL TEST
SIMPLE TEST ###.#min
Test mode activated and test timer counting down
FULL TEST ###.#min
ISLAND MAN
Genset stopped or running and no other action taking
place
ISLAND SEMI
READY ISLAND AUTO
Genset stopped in Auto
ISLAND ACTIVE
Genset running in Auto
AMF MAN
Genset stopped or running and no other action taking
place
AMF SEMI
READY AMF AUTO
Genset stopped in Auto
AMF ACTIVE
Genset running in Auto
LOAD TAKEOVER MAN
Genset stopped or running and no other action taking
place
LOAD TAKEOVER SEMI
READY LTO AUTO
Genset stopped in Auto in load takeover operation mode
LTO ACTIVE
Genset running in Auto in load takeover operation mode
DG BLOCKED FOR
START
Generator stopped and active alarm(s) on the generator
GB ON BLOCKED
Generator running, GB open and an active "Trip GB"
alarm
SHUTDOWN OVERRIDE
The configurable input is active
ACCESS LOCK
The configurable input is activated, and the operator tries
to activate one of the blocked keys
GB TRIP EXTERNALLY
Some external equipment has tripped the breaker
An external trip is
logged in the event
log
MB TRIP EXTERNALLY
Some external equipment has tripped the breaker
An external trip is
logged in the event
log
IDLE RUN
The "Idle run" function is active. The genset will not stop
until a timer has expired
IDLE RUN ###.#min
The timer in the "Idle run"’ function is active
Aux. test ##.#V ####s
Battery test activated
START PREPARE
The start prepare relay is activated
START RELAY ON
The start relay is activated
START RELAY OFF
Start relay is deactivated during the start sequence
MAINS FAILURE
Mains failure and mains failure timer expired
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...