Section 75
00-02-0878
2013-03-07
- 4 -
Introduction
This Operator's Manual includes general product information, display readings, push-
button, LED functions, alarm handling descriptions, and presentation of the log list. This
manual is intended to help optimize the operator s daily use. On the basis of this
document, the operator will be able to carry out simple procedures such as start/stop
and control of the generator set.
As a Reference point: Please note that the "U" symbol is also used as an
indication for the voltage.
EMS-GC10
delivers field-adjustable operating parameters
but may require further
configuration using the Utility Software. It can support both mechanical and J1939
electronic engines.
The
EMS-GC10
is ideal for use with a remote modem or in a SCADA system offering
Modbus® RTU protocol on the RS485 port.
Product Description
The EMS-GC10 Genset Controller provides flexible control and monitoring for industrial
genset applications. Typical applications include backup power, power supply for
remote locations without a connection to power grid, and mobile power for remote
locations. The controller supports programmable logic, up to 40 expressions, and can
be configured for specific predefined functions unique to your application.
The EMS-GC10 supports Automatic Mains Failure (AMF) and generator breaker
control.
The EMS-GC10 offers field-adjustable operating parameters that can be changed
through the controller or an easy to use PC configuration tool called Utility Software
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...