Test mode
The test mode function is activated by the TEST push-button on the display, the
Modbus, USW or by activating a digital input.
The settings for the test function are set up in parameter 7040 Test. Use the USW to
view the USW settings.
1. Timer: Period starts when U/f is ok. Engine stops when time runs out.
2. Return: When the test is completed, the unit will return to the selected
mode (manual or auto).
3. Type: Selection of one of the two types of tests: simple or full.
NOTE:
If the timer is set to 0.0 min., the test sequence will be
infinite. The test will be cancelled by pushing TEST again.
NOTE:
Test mode is not available in an island application
Simple Test
EMS-GC10 controller unit will go through the start sequence and run the engine for the
time set in parameter 7041 without any breaker operation. This sequence is initiated by
a digital input or the TEST push-button on the front. The test will run until the timer
expires. When the timer runs out, the stop sequence including cooling down will be
carried out.
If the timer in parameter 7040 is set to 0, the test is infinite. The test will be interrupted if
the mode is changed to: manual, semi-auto, or auto.
Full Test
The full test will start the genset, open the mains breaker and close the generator
breaker. When the test timer expires or the test is cancelled by mode change, the
generator breaker is opened, the mains breaker closed, and the generator is stopped
after the cool-down time.
NOTE:
To run the full test, it is required that EMS-GC10 is in AMF
or LTO mode.
NOTE:
It is possible to open and close the generator breaker and
the mains breaker in manual mode.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...