Section 75
00-02-0878
2013-03-07
- 19 -
When the mains returns, the unit will switch back to mains supply and cool down and
stop the genset. The switching back to mains supply is done when the adjusted "Mains
OK delay” has expired.
NOTE:
For a general description of the available running modes,
please refer to the chapter "Running mode description".
Island Operation
Auto Mode Description:
The unit automatically starts the genset and closes the generator breaker at a digital
start command. When the stop command is given, the generator breaker is tripped, and
the genset will be stopped after a cooling down period. The start and stop commands
are used by activating and deactivating a digital input or with the time-dependent
start/stop commands. If the time-dependent start/stop commands are to be used, the
auto mode must also be used.
NOTE:
For a general description of the available running modes,
please refer to the chapter "Running mode description".
Load Takeover
Auto Mode Description:
The purpose of the load takeover mode is to transfer the load imported from the mains
to the genset for operation on generator supply
The unit automatically starts the genset and closes the generator breaker at a digital
start command. When the stop command is given, the generator breaker is tripped, and
the genset will be stopped after a cooling-down period. The start and stop commands
are used by activating and deactivating a digital input or with the time-dependent
start/stop commands. If the time-dependent start/stop commands are to be used, then
the auto mode must also be used.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...