Section 75
00-02-0878
2013-03-07
- 2 -
Warnings and Legal Information
Legal Information and Responsibility
FW Murphy takes no responsibility for installation or operation of the generator set. If there is
any doubt about how to install or operate the engine/generator controlled by the EMS-GC10
unit, the company responsible for the installation or the operation of the set must be
contacted.
IMPORTANT: The EMS-GC10 unit is not to be opened by
unauthorized personnel. If this occurs, the warranty will be void.
Disclaimer
FW Murphy reserves the right to change any of the contents of this document without prior
notice.
Electrostatic Discharge Awareness
Sufficient care must be taken to protect the terminals against static discharges during the
installation. Once the unit is installed and connected, these precautions are no longer
necessary.
Safety Issues
Installing and operating the EMS-GC10 unit may imply work with dangerous currents and
voltages. Therefore, the installation should only be carried out by authorized personnel
who understand the risks involved in working with live electrical equipment.
WARNING: Be aware of the hazardous live currents and voltages.
Do not touch any AC measurement inputs as this could lead to
injury or death.
Factory Settings
The EMS-GC10 unit is delivered from the factory with certain factory settings. These are based
on average values and are not necessarily the correct settings for matching the
engine/generator set in question. Precautions must be taken to check the settings before
running the engine/generator set.
NOTE:
When the controller unit operates for the first time after it has been
received from the factory, both mains and generator breakers alarms will
be activated to warn the user (shown as fault), until they are connected to
the power system and reset accordingly.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...