Section 75
00-02-0878
2013-03-07
- 111 -
Communication System
All these protocols are based on a CANbus communication system. Except for the MDEC and
ADEC communication, all are based on the J1939. The MDEC and ADEC protocols are MTU-
designed protocols based on CANopen.
The Baud rate is fixed by the engine manufacturer at:
MDEC, ADEC
Caterpillar, Cummins, Detroit Diesel, Deutz, Iveco, John Deere, Perkins,
MTU J1939 Smart Connect, Scania and Volvo Penta
125 kb/s
250 kb/s
EIC Unit
The selection of the EIC unit (parameter 10970) determines whether bar/PSI and
Celsius/Fahrenheit is used. The selection affects display readings, values used for alarm
evaluation (parameter 76xx) and data readable by Modbus communication.
Common for all Alarm Functions
A number of alarms can be configured. The following items can be configured to an alarm:
Parameter Alarm
Comment
7570
El comm. Error
Communication error
7580
EIC warning
Any alarm listed as warning for the selected engine
type in the section “Specific Engine Type
Descriptions”.
7590
EIC shutdown
Any alarm listed as shutdown for the selected
engine type in the section “Specific Engine Type
Descriptions”.
7600
EIC overspeed
Actual RPM
7610/7620 EIC coolant t. (2 levels)
Actual temperature
7630/7640 EIC oil press. (2 levels)
Actual pressure
7650/7660 EIC oil temp. (2 levels)
Actual temperature
7670/7680 EIC coolant level (2 levels)
Actual cooling water level
J1939 Measurement Table
This is the common J1939 measurement overview showing which measurements are
available. Note that not all measurements are supported by the individual engines; please refer
to the specific engine description.
The table below shows which values can be displayed in the view parameter that is in V1, V2
and V3.
The display values corresponding to the engine communication have a description beginning with
“EIC”.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...