Section 75
00-02-0878
2013-03-07
- 133 -
Shutdown
Below is a shutdown value that can be shown on the display. It is possible to configure “EIC
Shutdown” in the system setup to put the unit in a shutdown state and/or to activate relay
outputs if necessary. The shutdown state is present, until it disappears in the ECM module.
Shutdown List
AL Com. Alarm Red
Write Commands to Engine Controller
•
Engine Controls
All the write commands to the engine controller (ex: speed, start/stop, etc.) are
enabled in parameter 7563 (EIC Controls).
•
Engine Speed
CANbus ID for speed control: 0x300+ADEC ID – speed demand telegram (ADEC ID
is selected in parameter 7562, default ID is 6: 0x306).
M-Logic commands are available to enable/disable start/stop and speed controls:
•
EIC Start/Stop Enable
NOTE:
The speed regulation is enabled in parameter 2781 (Reg. output)
and 7563 (EIC Controls).
•
Start/Stop command
•
Frequency Selection
Nominal frequency is written automatically based on the frequency nominal
parameter. 50 Hz is written if fNOM <55Hz, 60 Hz is written if fNOM
is >55 Hz.
NOTE:
The CANopen node ID no is selected in parameter 7562. The
default value (6) usually matches the ADEC parameter.
•
Demand switch
Set method of speed control between digital (Up/down ECU with relay controls),
analog (“Analog ECU Relative” for analog VDC control) or from J1939 commands
(“Analog CAN”). This is selected in parameter 2790. Please refer to the MTU
documentation for the ECU8 for further information about switching between normal
and emergency operation in local or remote.
•
Trip counter
This command resets the trip fuel consumtion counter. The command is activated
through M-Logic.
•
Enable Cylinder Cutout
The command can be used to engage all cylinders if the engine is running with one
bank only. The command is activated through M-Logic.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...