Section 75
00-02-0878
2013-03-07
- 72 -
The drawing below shows that when the test is started, the start relay activates making
the engine turn.
Input Configuration
If this function is to be used, it is necessary to configure a digital input that
initiates the function. Using the PC software (USW), this is done in the
`dialogue box below:
If AUTO mode is selected, the mains failure sequence will be
initiated if a mains failure occurs during the battery test.
Auto Configuration
If the automatic battery test is used, the function has to be enabled in parameters 6420,
6421, 6423–6425. When the function is enabled, the battery test will be carried out with
a specified interval, for example, once a week. Completed battery tests will be logged in
a separate battery test log.
The factory setting in parameter 6424 is 52 weeks. This means,
that the automatic battery test will be executed once a year.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...