Section 75
00-02-0878
2013-03-07
- 100 -
Parameter Settings
In parameter 6006 the switching is made between settings 1 to 4, for the generator,
simply by choosing the desired nominal setting, just as it is for the Busbar group choice
in parameter 6054.
AC Voltage Scaling
Default AC voltage scaling is set to range 100 V-25000 V (parameter 9030). To be able
to handle applications above 25000 V and below 100 V, it is necessary to adjust the
input range so it matches the actual value of the primary voltage transformer. This
makes it possible to support a wide range of voltage and power values.
Setup of the scaling can be done in parameter 9030 from the display window shown in
the following illustration.
Changing the voltage scaling will also influence the nominal power scaling:
Scaling
Parameter 9030
Nom. Settings 1 To 4
(Power) Will Change
According To Parameter
9030
Nom. Settings 1 To 4
(Voltage) Will Change
According To Parameter
9030
Transformer Ratio
Settings
Parameter 6041, 6051
And 6053
10 V-2500 V
1.0-900.0 kW
10.0 V-2500.0 V
10.0 V-2500.0 V
100 V-25000 V
10-20000 kW
100 V-25000 V
100 V-25000 V
1 kV-75 kV
0.10-90.00 MW
1.00 kV-75.00 kV
1.00 kV-75.00 kV
10 kV-160 kV
1.0-900.0 MW
10.0 kV-160.0 kV
10.0 kV-160.0 kV
NOTE:
All nominal values and the Primary Transformer (PT)
settings must be corrected after the scaling has been changed in
parameter 9030.
Summary of Contents for EMS-GC10
Page 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Page 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Page 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Page 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Page 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Page 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Page 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Page 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Page 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Page 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Page 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Page 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Page 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Page 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...