Table of contents
xv
Auto Sequence Operation Group (
Option Module Function Group (
PRT).......................... 437
M2) .......................... 440
Trip Mode (TRP Current (or Last-x)) ............................................................ 441
Traverse Operation Function Group (
Safety Function Wiring Diagram ............................................................ 448
Installing the Safety Board to 0.75
160 kW Product .......................... 449
Installing the Safety Board to 185
375 kW Product ........................... 449
Safety Function Terminal Description ................................................... 450
Cable Specification for Signal Terminal Block Wiring ......................... 450
DNV (Det Norske Veritas) Marine Certification Details ........................... 451
Marine Certification Models for SV-iS7 Products ..................................... 452
Power(HP), Input Current and Output Current ........................................ 455
Input Frequency and Voltage Tolerance ................................................... 456
Summary of Contents for SV-iS7 Series
Page 17: ......
Page 114: ...Peripheral Devices 97 Group 2 ...
Page 115: ...Peripheral Devices 98 Group 3 ...
Page 116: ...Peripheral Devices 99 Group 4 ...
Page 159: ...Basic Functions 142 Code Description V1 Quantizing ...
Page 465: ...Safety Funtion STO Safe Torque Off 448 14 2 1 Safety Function Wiring Diagram ...