2NL/2P8
2-3-33
Connector
Pin
Signal
I/O
Voltage
Description
TB
1
LIVE
I
120 V AC
220-240 V AC
AC power input
Connected to
AC inlet and
AC connect
PWB
2
NEUTRAL
I
120 V AC
220-240 V AC
AC power input
5
DH_LIVE
I
120 V AC
220-240 V AC
AC power input
YC1
1
LIVE_IN
O
120 V AC
220-240 V AC
AC power output to MSW
Connected to
main power
switch
2
LIVE_OUT
I
120 V AC
220-240 V AC
AC power input from MSW
3
NETRAL_OU
T
I
120 V AC
220-240 V AC
AC power input from MSW
4
NETRAL_IN
O
120 V AC
220-240 V AC
AC power output to MSW
YC5
1
5V0
O
5 V DC
5 V DC power output to EPWB
Connected to
engine PWB
2
5V0
O
5 V DC
5 V DC power output to EPWB
3
GND
-
-
Ground
4
GND
-
-
Ground
YC6
1
DRM_HEAT_
REM
I
0/3.3 V DC
FH: On/Off
Connected to
engine PWB
2
24V3
O
24 V DC
24 V DC power output to EPWB
3
GND
-
-
Ground
4
GND
-
-
Ground
5
LVU_SLEEP
O
0/3.3 V DC
Sleep signal
6
ZCROSS
O
DC0V/3.3V(palse) Zero cross signal
7
RELAYREM
I
0/3.3 V DC
Power relay signal: On/Off
8
MHREM
I
0/3.3 V DC
FH1: On/Off
9
SHREM
I
0/3.3 V DC
FH2: On/Off
YC7
1
LIVE
I
100 V AC
100 V AC power input from PFDSW
Connected to
paper feeder
detection
switch
2
NC
-
-
Not used
3
LIVE
O
100 V AC
100 V AC power output to PFDSW
YC8
1
DH_LIVE
O
100 V AC
100 V AC power output to CH
Connected to
cassette
heater
2
DH_LIVE
-
-
Not used
3
NC
-
-
Not used
4
NC
-
-
Not used
5
DH_NEUTRA
L
O
100 V AC
100 V AC power output to CH
6
DH_NEUTRA
L
-
-
Not used
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...