2NL/2P8
2-3-1
2-3 Operation of the PWBs
2-3-1 Main PWB
Figure 2-3-1 Main PWB silk-screen diagram
YC31
U1
YC25
YC11
YC30
YC7
YC23
YC27
YC32
YC42
YC8
YC9
YC43
YC2
YC5
BAT1
YS1
YC1
U9
YC12
YC6
YC20
YC33
BLACK
BLUE
BK
WH
WH
YC21
YC22
YC26
YS3
YS5
U2
YC10
1
1
1
1
1
3
1
1
1
1
7
41
10
1
200
1
20
1
3
1
3
10
1
1
5
12
1
1
6
15
6
8
7
1GB
2GB
1
5
1
5
200
STD
OPT
72
1
1
50
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...