2NL/2P8-8
1-4-26
2000
Main motor steady-state
error
After main motor is stabilized,
the ready signal is at the H
level for 2 s continuously.
Main motor
1. To check the motor operation execute
U030 Main (main motor) (see page 1-3-
31).
2. Check the drive gear can rotate or they
are not unusually loaded and, if neces-
sary, replace.
3. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
Main motor and Engine PWB (YC16)
4. If the wiring is disconnected, shorted or
grounded, replace the wiring.
5. Replace the main motor.
Engine PWB
1. Check the engine software and upgrade
to the latest, if necessary.
2. Replace the engine PWB (see page 1-5-
2010
Main motor startup error
Main motor is not stabilized
within 1 s since the motor is
activated.
Main motor
1. To check the motor operation execute
U030 Main (main motor) (see page 1-3-
31).
2. Confirm that the wiring connector is
firmly connected and, if necessary, con-
nect the connector all the way in.
Main motor and Engine PWB (YC16)
3. If the wiring is disconnected, shorted or
grounded, replace the wiring.
4. Replace the main motor.
Engine PWB
1. Check the engine software and upgrade
to the latest, if necessary.
2. Replace the engine PWB (see page 1-5-
Code
Contents
Related parts
Check procedures/
corrective measures
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...