2NL/2P8
1-3-129
U425
Method: [Chart2]
1. Press the start key.
2. Select the item.
Method: [CCD]
1. Select the item to be set.
2. Select the item to be set.
3. Enters the value that is indicated on the back of the chart using the +/- keys or numeric keys.
4. Press the start key. The value is set.
Item No.
Description
Display
Description
CCD
Entering the target values of the chart (P/N: 302FZ56990)
used for adjustment
DP
Entering the measurement value of the chart (P/N:
302AC68243) used for adjustment
Display
Description
N875
Setting the N875 patch for the original for adjustment
N475
Setting the N475 patch for the original for adjustment
N125
Setting the N125 patch for the original for adjustment
C
Setting the cyan patch for the original for adjustment
M
Setting the magenta patch for the original for adjustment
Y
Setting the yellow patch for the original for adjustment
R
Setting the red patch for the original for adjustment
G
Setting the green patch for the original for adjustment
B
Setting the blue patch for the original for adjustment
Adjust Original
Setting the main and auxiliary scanning directions
Display
Description
Setting range
L
Setting the L value
0.0 to 100.0
a
Setting the a value
-200.0 to 200.0
b
Setting the b value
-200.0 to 200.0
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...