2NL/2P8
1-4-49
8140
DF tray error 1
When the main tray has
ascended, DF tray sensor 1 or
DF tray upper surface sensor
does not turn on within 20 s.
DF tray motor
1. Execute U240 Motor - Tray to check the
finisher operation (see page 1-3-90).
2. Manipulate the main tray up and down to
check it is smoothly operable.
3. Check that the drive from the motor
reaches the main tray.
4. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF tray motor and DF Main
PWB(YC16) (3000-sheet finisher)
DF tray motor and DF Main
PWB(YC14) (1000-sheet finisher)
5. If the wiring is disconnected, shorted or
grounded, replace the wiring.
6. Replace the DF tray motor.
DF tray sensor 1
DF tray upper
surface sensor
1. Execute U241 Finisher - Tray U-Limit,
Tray Top to check the finisher switch
(see page 1-3-92).
2. Check that the sensor and its mounting
bracket are correctly positioned.
3. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF tray sensor 1 and DF Main
PWB(YC22) (3000-sheet finisher)
DF tray upper surface sensor and DF
Main PWB(YC21,YC13) (3000-sheet
finisher)
DF tray sensor 1 and DF main PWB
(YC20) (1000-sheet finisher)
DF tray upper surface sensor and DF
main PWB (YC18) (1000-sheet finisher)
4. Replace the DF tray sensor 1 or DF tray
upper surface sensor.
DF main PWB
Replace the DF main PWB (Refer to the
service manual for the document finisher).
Code
Contents
Related parts
Check procedures/
corrective measures
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...