2NL/2P8
1-4-57
8230
DF staple motor error 1
Staple JAM (DF) has been
detected twice in a row. (The
second JAM detection
condition fullfilled with the
home position did not
detected in 600 ms after the
motor was driven.)
DF staple motor
1. Remove the staple unit and check that
stapling is possible without a jam.
2. Confirm that the FCC wiring connector is
not distorted and connect the FCC
wiring all the way in.
Staple unit and DF main PWB (YC17)
(3000-sheet finisher)
Staple unit and DF main PWB (YC11)
(1000-sheet finisher)
3. If the wiring is disconnected, shorted or
grounded, replace the wiring.
4. Replace the staple unit. (Refer to the
service manual for the document
finisher).
DF staple sensor
Replace the staple unit.
DF main PWB
Replace the DF main PWB (Refer to the
service manual for the document finisher).
8240
DF staple motor error 2
Staple JAM (DF) has been
detected twice in a row.
(The second JAM detection
condition fullfilled with a lock
detection signal maintained 1
V for 500 ms continuously,
while the stapler motor was
driven.)
DF staple motor
1. Remove the staple unit and check that
stapling is possible without a jam.
2. Confirm that the FCC wiring connector is
not distorted and connect the FCC
wiring all the way in.
Staple unit and DF main PWB (YC17)
(3000-sheet finisher)
Staple unit and DF main PWB (YC11)
(1000-sheet finisher)
3. If the wiring is disconnected, shorted or
grounded, replace the wiring.
4. Replace the staple unit. (Refer to the
service manual for the document
finisher).
DF main PWB
Replace the DF main PWB (Refer to the
service manual for the document finisher).
Code
Contents
Related parts
Check procedures/
corrective measures
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...