2NL/2P8-6
1-3-180
U952
Method: [Execute(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Execute(USB)].
6. Select the workflow.
7. Press the start key.
Executes maintenance modes defined in a workflow in succession.
Method: [Entry(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Entry(USB)].
6. Select the workflow.
7. Select the work flow save area.
8. Select [Execute].
Exports a workflow housed in a USB flash device to the machine.
Example
Registration is feasible when a USB flash device that stores the commands and text/mainte-
nance ID (editable) is inserted.
File Format: xxx.mwf
1.SET UP, 327, 278, 000, 927
2.WARRANTY, 089, 000
3.MK-A, 127, 167, 130, 410, 251
4.EH SET UP, 411, 034, 246
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
Item No.
Description
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
Data1 - 8
The area to store workflows in the machine
USB
USB memory
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...