2NL/2P8
1-4-67
9140
Sensor error in coin vender
change (Yen 100)
Change is empty despite
change is enough.
Coin jam in the
change tube
Check visually and remedy.
Contact in the
connector
Check the connection of the empty change
sensor.
Change empty
sensor
Replace the coin mec.
Coin vender control
PWB
Replace the coin mec.
9150
Sensor error in coin vender
change (Yen 500)
Change is empty despite
change is enough.
Change tube
Check no exchange jam is observed at the
outlet and, if necessary, repair it.
Contact in the
connector
Check the connection of the empty change
sensor.
Change empty
sensor
Replace the coin mec.
Coin vender control
PWB
Replace the coin mec.
9160
Coin vender pay-out error
Coin is paid out despite the
pay-out motor is determined
not active.
Pay-out motor
Replace the coin mec.
9170
Coin vender pay-out sensor
error
Coin is paid out despite the
pay-out motor is determined
not active.
Pay-out area
Check no exchange jam is observed at the
outlet and, if necessary, repair it.
Pay-out motor
Replace the coin mec.
Pay-out sensor
Replace the coin mec.
9500
ISC PWB error A
Main PWB
ISC PWB
1. Reinsert the connector if its connection
is loose.
Main PWB (YC25) and ISC PWB (YC4)
2. Replace the main PWB (see page 1-5-
3. Replace the ISC PWB
4. Contact the Service Support.
9510
ISC PWB error B
Main PWB
DP SHD PWB
1. Reinsert the connector if its connection
is loose.
DP relay PWB (YC2) and DP SHD PWB
(YC3)
2. Replace the main PWB (see page 1-5-
3. Replace the DP SHD PWB.
4. Contact the Service Support.
Code
Contents
Related parts
Check procedures/
corrective measures
Summary of Contents for TASKalfa 3010i
Page 10: ...This page is intentionally left blank ...
Page 100: ...2NL 2P8 1 2 76 This page is intentionally left blank ...
Page 286: ...2NL 2P8 1 3 186 This page is intentionally left blank ...
Page 443: ...2NL 2P8 1 5 59 This page is intentionally left blank ...
Page 471: ...2NL 2P8 2 2 8 This page is intentionally left blank ...
Page 532: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Page 568: ...DP 773 Document processor Installation Guide ...
Page 594: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 602: ...PF 810 3000 sheet deck Installation Guide ...
Page 615: ...DF 791 3000 sheet finisher Installation Guide ...
Page 630: ...DF 770 D 1000 sheet finisher Installation Guide ...
Page 648: ...AK 740 Bridge unit Installation Guide ...
Page 650: ...MT 730 B Mailbox Installation Guide ...
Page 665: ...PH 7A C D Punch unit Installation Guide ...
Page 686: ...DT 730 B Document tray Installation Guide ...
Page 731: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 732: ...FAX System W B Installation Guide ...