
Operation
9
Threading the upper twine
9.10
BiG Pack 1270
Original Operating Instructions 150000747_02_en
101
9.10
Threading the upper twine
Guiding the upper twine further to the upper twine guide
Left-hand machine side
Right-hand machine side
1
2
3
1
2
3
5
1
2
3
7
1
2
3
5
BPG000-028
Make sure that the upper twines never cross over each other.
Guide the 3 upper twines (1, 2, 3) coming from the twine box (5) further to the upper twine
guide (7).
Guide the 3 upper twines (1, 2, 3) through the eyes of the upper twine guide (7) and then
further to the twine brakes at the knotters.
Guiding the upper twine from the upper twine guide to the upper needles
1
2
3
1
2
3
1
2
3
7
8
9
BPG000-029
Release the twine brake (9).
Guide the 3 upper twines (1, 2, 3) coming from the upper twine guide (7) through the rear
eyes (8) and attach them on the brake rolls.
Rotate brake rolls manually. In this process, the upper twine is guided through the brake
rolls.