B-10
APPENDIX B - DAILY CNG AND CNG WITH RECOVERY MODE
D
AILY
Base - 02/2012
Printed 603.95.241
Operations on the system
B.3.5
Emptying the gas system
!
Before performing significant operations (such as welding) or servicing the engine, the gas circuit must
be completely ventilated with air.
It is usually sufficient to partially empty the system (i.e. to empty the pipes and leaving the cylinders as are) but the entire system
(pipes and cylinders) may need to be emptied in some cases.
Decide which procedure is required on a case-by-case basis according to the severity and type of intervention to be performed.
If in doubt, choose the safest solution (complete emptying).
If the engine conditions so allow (e.g. no leakages), it is advisable to use up all the gas by running the engine.
Running the engine with system pressure under 20 bar does not ensure the correct fuel metering.
Below 20 bar, the engine must be run at idle speed only to prevent damage to the catalytic
converter.
NOTE
Perform the emptying operations described below with the engine off and in the open-air. Maintain a spark-free area of at least
5 meters around the vehicle.
Summary of Contents for DAILY M.Y. 2012
Page 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Page 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Page 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Page 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Page 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Page 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...