CHASSIS MODIFICATIONS
2-47
D
AILY
Printed 603.95.241
Base — 02/2012
Operations on sheet metal
c)
Changes to roof panel height
In production, three roof panel versions are available with respective internal heights equal to:
-
low roof
= 1595 mm
-
medium roof
= 1900 mm
-
high roof
= 2100 mm
Changing the height of the roof panel is a very complicated and onerous operation: therefore, this operation must be limited to
the medium and high roof versions that have the same structure as the roof panel.
Figure 2.23 shows the cross section of two versions where it is possible to see that the roof panel is a unified structure.
To permit the correct connection with the original roof panel, the fitter must ensure suitable operations on the hoops
of the side panel.
Figure 2.23
102433
Summary of Contents for DAILY M.Y. 2012
Page 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Page 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Page 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Page 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Page 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Page 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...