POWER TAKE OFFS
4-13
D
AILY
Printed 603.95.241
Base - 02/2012
PTO management
4.6.2
PTO mode
4.6.2.1 Mechanical gearbox
PTO engagement
The purpose of this operation is to prepare the equipment installed on the vehicle for work.
When carrying out the operating sequence, the driver is assisted in order to avoid errors.
a)
If the equipment is of the type working with vehicle stopped
(stationary PTO)
:
-
stop the vehicle and apply the hand brake;
-
press the clutch pedal;
-
put the gearbox into neutral;
-
keeping the clutch pedal depressed, press and release button (1) on the PTO control panel (Figure 4.6, page 4-11).
The PTO engagement indicator (2) blinks slowly at first and stays on fixed when the operation is successfully concluded;
-
slowly release the clutch pedal.
b)
If the equipment is the type that works also when the vehicle is running
(non-stationary PTO)
the same procedure basically
applies except for the need to engage the right gear for the work (first, reverse or possibly neutral) before slowly releasing the
clutch pedal.
To adjust the engine speed, see paragraph 4.6.2.3.
PTO disengagement
Irrespective of the type of PTO installed:
-
stop the equipment;
-
press the clutch pedal;
-
press the pushbutton (1): the indicator (2) goes off when the PTO is disengaged;
-
release the clutch pedal.
For safety reasons, when the non-stationary PTO is engaged:
- gear changes (involving automatic disengagement) are not possible
- the vehicle should not be driven over 20 km/h.
!
The PTO must be disengaged when torque drawing is not in progress.
If an after market PTO is to be installed, check to ensure that the vehicle is equipped with the Cruise
Control option.
NOTE
After fitting an after-market PTO, refer to the IVECO Assistance Service for updating the engine
ECU software via remote service.
NOTE
Summary of Contents for DAILY M.Y. 2012
Page 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Page 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Page 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Page 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Page 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Page 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...