APPENDIX B - DAILY CNG AND CNG WITH RECOVERY MODE
B-13
D
AILY
Printed 603.95.241
Base - 02/2012
Operations on the system
Figure B.11
87391
•
Remove the piston (5) with shutter (4) and the spring (2) from the coil holder sleeve (1) being very careful not to misplace the
pin (3) fastening the shutter to the piston.
•
If the VBE valves do not need to be replaced, check the conditions of the removed parts, including the o-rings. Replace them
if needed during assembly.
•
Fasten the empty coil holder sleeve with its o-ring and fasten the ring nut at a torque of 28 Nm.
•
Repeat the operations on all the VBE valves of the cylinders.
Emptying
•
Open the manual valves half way (5) (Figure B.7).
This operation ensures that pressurised gas enters the pipes: for this reason, exercise maximum care.
After emptying operations, check that the engine cannot stop.
!
If the VBE valves are not replaced after the complete emptying procedure, refit the previously removed parts (which were either
carefully put aside or replaced) as shown in the following paragraph.
Summary of Contents for DAILY M.Y. 2012
Page 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Page 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Page 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Page 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Page 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Page 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Page 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...