HumaStar 600
| User manual
94
6.2.7 CONSUMPTION
This section applies to kinetic methods only.
Item
Input
Comments
Consumption check
Check / No Check
Check to enable substrate depletion check; reaction
curve will be checked for a excessive initial substrate
consumption
Limit (Abs/min)
-999999 to 999999 Given by the manufactorer (approx. Abs/min of the lin-
erarity limit at the point of interest)
First and second point Check / No Check
Check and evaluation is performed between the two
first reading points
Time and first point
Check / No Check
Check and the evaluation is performed before the read-
ing is started
Time before first (sec) 0 to ...
Define the time when the check should take place (rec-
ommendation: incubation < 60 sec set to 15; incubation
> 60 sec set to 30)
Behaviour
Conservative
Check / No Check
Check and during the reading time the system perform
10 readings
Adaptative
Check / No Check
Check and the system will automatically increase the to-
tal reaction time and the interval between the readings
if the consumption rate is low to optimze precision and
decrease the total reading interval if the consumption
rate is high to preserve linearity; recommended
Initial absorbance
limit
-999999 to 999999 Insert the OD limit; if absorbance is below limit in a de-
creasing reaction or above limit in increasing reaction
the sample will be prediluted
Dilution factor
1 to 120
Insert a dilution factor
FIGURE 92
TABLE 15
Summary of Contents for HumaStar 600
Page 1: ...HumaStar 600 User Manual Cat No 16660 001...
Page 2: ......
Page 4: ......
Page 14: ...HumaStar 600 User manual 10...
Page 44: ...HumaStar 600 User manual 40...
Page 108: ...HumaStar 600 User manual 104...
Page 129: ...125...
Page 130: ...HumaStar 600 User manual 126...
Page 131: ......