![Huawei Quidway NetEngine40E Configuration Manual - Reliability Download Page 776](http://html.mh-extra.com/html/huawei/quidway-netengine40e/quidway-netengine40e_configuration-manual-reliability_169453776.webp)
Context
In
, a VLL is established between PE1 and PE2. MEP1 is configured on an AC
interface of PE1, and MEP2 is configured on an AC interface of PE2. MEP1 initiates an ETH-
test and sends test packets with a specified size and code type at a specified rate and interval.
Then check the number of packets MEP1 sends and the number of packets MEP2 receives. If
MEP1 sends more packets than MEP2 receives, some packets have been dropped. Then MEP1
is configured to use the bisection method to continue the test and send test packets at a lower
rate. The bisection method is used to send test packets at different rates between the upper and
lower rate thresholds. The test process repeats until a maximum bandwidth is found when no
packets are dropped in a test. In addition, check for bit errors on MEP2 that receives test packets.
Figure 8-53
ETH-test function for a VLL network
VLL
PE2
CE1
CE2
PE1
MEP1
PW
MEP2
ETH-TEST
Procedure
Step 1
Perform the following steps on PEs:
1.
Run:
system-view
The system view is displayed.
2.
Run:
cfm enable
CFM is enabled globally.
By default, CFM is disabled globally.
3.
Run:
cfm md
md-name
The MD view is displayed.
4.
Run:
ma
ma-name
The MA view is displayed.
5.
Run:
map mpls l2vc
vc-id
{
raw
|
tagged
}
The MA is associated with an L2VC.
6.
Run:
mep mep-id
A MEP is configured.
HUAWEI NetEngine80E/40E Router
Configuration Guide - Reliability
8 Ethernet OAM Configuration
Issue 02 (2014-09-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
759