![Honda NC700 2012 Service Manual Download Page 561](http://html.mh-extra.com/html/honda/nc700-2012/nc700-2012_service-manual_2157369561.webp)
16-18
dummyhead
dummyhead
ENGINE REMOVAL/INSTALLATION
Connect the ECT sensor 2P connector [1].
Connect the water hose [2] to the thermostat cover.
Align the water hose paint mark with the thermostat
cover tab.
Install the main wire harness [3] to the stay [4] and
frame [5].
Tighten the water hose band screw to the specified
range.
Connect the EOP switch 1P (Gray) connector [1].
Install the stay [2] and bolts [3] to the frame.
Tighten the bolts securely.
Install the spark plug wire clamp [1] to the frame.
Connect the spark plug cap [2].
[4]
[1]
[3]
[2]
[5]
Align
0 – 1 mm
(0 – 0.04 in)
[2]
[3]
[1]
[1]
[2]
Summary of Contents for NC700 2012
Page 5: ...MEMO dummyhead dummyhead ...
Page 46: ...1 41 dummyhead dummyhead GENERAL INFORMATION NC700X CLUTCH CABLE BRAKE HOSE ...
Page 131: ...MEMO dummyhead dummyhead ...
Page 257: ...7 2 dummyhead dummyhead FUEL SYSTEM FUEL SYSTEM COMPONENT LOCATION ...
Page 279: ...MEMO dummyhead dummyhead ...
Page 295: ...MEMO dummyhead dummyhead ...
Page 355: ...MEMO dummyhead dummyhead ...
Page 480: ...13 3 dummyhead dummyhead ALTERNATOR STARTER CLUTCH NC700XD SD 157 N m 16 0 kgf m 116 lbf ft ...
Page 491: ...MEMO dummyhead dummyhead ...
Page 523: ...MEMO dummyhead dummyhead ...
Page 571: ...MEMO dummyhead dummyhead ...
Page 639: ...MEMO dummyhead dummyhead ...
Page 681: ...MEMO dummyhead dummyhead ...
Page 723: ...MEMO dummyhead dummyhead ...