Set The Number Of Days Until The First Test Report
If test reports are required, "LOCATION 182 - 185" on page 114 will need to be programmed.
After this has been carried out, test reports need to be initiated by setting the first test report. If
the first test report is not set, the test report will be transmitted in the number of days as
programmed in the repeat interval programmed in "LOCATION 182 - 185".
Each time Installer's Programming Mode has been entered, you will need to reset the
number of days until the first test report. Otherwise, the next test report will report as
programmed in the repeat interval time.
How To Set The First Test Report
1.
Enter your
followed by
2
and the
button.
Three beeps will be heard and the
STAY
and
AWAY
indicators will begin to flash.
2.
Enter the
to wait (1-99) until the first test report.
3.
Press the
button when finished.
Two beeps will be heard and the
STAY
and
AWAY
indicators will extinguish.
+
2
+
+
+
Test reports will not report if the Subscriber ID Number is 0000. The number of day’s
decrements by one at 2400 hours as set in "LOCATION 901 – 904" on page 132.
2
48
Solution 4+4
Installation Manual
ISSUE123.DOC
Electronics Design and Manufacturing Pty Limited
Summary of Contents for Solution 4+4
Page 1: ...Solution 4 4 Installation Manual ISSUE 1 23...
Page 2: ......
Page 4: ......
Page 6: ......
Page 13: ...Introduction This section includes the following Introduction Features Quick Start...
Page 89: ...User Codes This section includes the following Installer Code User Codes User Code Priority...
Page 163: ...Programming Sheets...
Page 169: ...Index...
Page 174: ......