236
PowerConnect B-Series FCX Configuration Guide
53-1002266-01
Configuring STP related features
8
FIGURE 30
Sync stage
•
Synced – Once the Designated port changes into a discarding state, it asserts a synced signal.
Immediately, Alternate ports and Backup ports are synced. The Root port monitors the synced
signals from all the bridge ports. Once all bridge ports asserts a synced signal, the Root port
asserts its own synced signal (
Figure 31
).
BigIron
Switch 100
Root Bridge
Port1
De
s
ign
a
ted port
Port1
Root port
Sync
Switch 200
Switch 300
Switch 400
Port2
Sync
Discarding
Port3
Sync
Discarding
Port2
Port3
Indic
a
te
s
a
s
ign
a
l
Summary of Contents for PowerConnect B-FCXs
Page 1: ...53 1002266 01 18 March 2011 PowerConnect B Series FCX Configuration Guide ...
Page 248: ...206 PowerConnect B Series FCX Configuration Guide 53 1002266 01 IPv6 management commands 7 ...
Page 374: ...332 PowerConnect B Series FCX Configuration Guide 53 1002266 01 Jumbo frame support 9 ...
Page 568: ...526 PowerConnect B Series FCX Configuration Guide 53 1002266 01 CLI examples 14 ...
Page 588: ...546 PowerConnect B Series FCX Configuration Guide 53 1002266 01 Sample application 15 ...
Page 684: ...642 PowerConnect B Series FCX Configuration Guide 53 1002266 01 VLAN based mirroring 20 ...
Page 724: ...682 PowerConnect B Series FCX Configuration Guide 53 1002266 01 Reading CDP packets 23 ...
Page 930: ...888 PowerConnect B Series FCX Configuration Guide 53 1002266 01 26 ...
Page 948: ...906 PowerConnect B Series FCX Configuration Guide 53 1002266 01 Configuring MLD snooping 27 ...
Page 1348: ...1306 PowerConnect B Series FCX Configuration Guide 53 1002266 01 Example configurations 36 ...
Page 1406: ...1364 PowerConnect B Series FCX Configuration Guide 53 1002266 01 IP source guard 39 ...