Replacing the Conveyor Clamp Blade
Use this procedure to replace the clamp blade on the front or back conveyor rail. This procedure
can be performed with access to the left/right of the machine in production line.This section
shows the procedure performed when the machine is not in production line.
Parts
Conveyor Blade
Required Tools
–
No. 4 Allen Key
–
Ball Pein Hammer
–
Threadlock Sealant (Loctite No. 2163 or equivalent)
➢
To replace the conveyor clamp blade
1. Turn off all electrical power to the system. For more information, refer to the section
2. Remove all the M4 screws on the top of the blade holder.
Figure 47.
Blade Holder and clamp blade
3. Remove and replace the old clamp blade with a new one.
4. Measure the distance gap between the top guide and the clamp blade. Repeat for the other
end.
Figure 48.
Top Guide Gap
5. The final position for the clamp blade is to have an optimal distance of 2.5–3 mm.
i
Note:
For Parts Replacement, contact CyberOptics for part numbers.
M4 nuts x 5
Summary of Contents for SE500ULTRA
Page 1: ...SE500ULTRA Hardware Manual ...
Page 6: ...Contents vi SE500ULTRA Hardware Manual ...
Page 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Page 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Page 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Page 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...