Chapter 3
:
Replacing Components and Preventive Maintenance
126
SE500
ULTRA
Hardware Manual
6. Replace with a new forcer. Grease adequately to the top forcer surface interfacing to the stage
carrier with WD04 anti-corrosion oil.
7. Replace back and tighten the forcer with the screws removed in step 3. Tighten the screws
after applying adequate amount of threadlocking sealant.
8. Replace back the forcer, hall sensors connectors and cables.
9. Check the air gap between the hall sensor and the stator with a 1.4 mm spacer. The air gap
must be maintained at a 1.4 mm gap width. Contact CyberOptics for the part number of the
spacer.
X-axis Forcer and hall sensor
Y-axis Forcer and hall sensor
Forcer
air gap
Summary of Contents for SE500ULTRA
Page 1: ...SE500ULTRA Hardware Manual ...
Page 6: ...Contents vi SE500ULTRA Hardware Manual ...
Page 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Page 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Page 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Page 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...