Chapter 3
:
Replacing Components and Preventive Maintenance
110
SE500
ULTRA
Hardware Manual
Replacing the Board Sensors
One board sensor is mounted on the middle conveyor section and two board sensors are
mounted on the left conveyor section. A forth sensor is mounted near the motor on the right side
of the conveyor section.
This procedure can be performed with access to the left/right of the machine in production line.
This section shows the procedure performed when the machine is not in production line.
Parts
Board Sensor
➢
To replace the board sensors
1. Turn off all electrical power to the system. For more information, refer to the section
2. Remove the two mounting screws and sensor slide bracket on the board sensor as shown in
3. Clip the cable ties to free the board sensor cable from the conveyor.
4. Disconnect board sensor cable and remove the board sensor.
5. Attach new board sensor to the sensor bracket and secure with two screws.
6. Connect board sensor cable.
7. Secure the cable ties so that the cables do not drag during X-axis or Y-axis movement.
i
Note:
For Parts Replacement, contact CyberOptics for part numbers.
i
Note:
For more information on system alignment, refer to “
Aligning the System”
section of the
“SE Series Solder Paste Inspection Software User Guide, Part Number: 8020277.
Summary of Contents for SE500ULTRA
Page 1: ...SE500ULTRA Hardware Manual ...
Page 6: ...Contents vi SE500ULTRA Hardware Manual ...
Page 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Page 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Page 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Page 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...