Chapter 2
:
Installation
24
SE500
ULTRA
Hardware Manual
6. Using the drill, a 13 mm socket attachment and hex head bolts, secure the lockdown plate
over each of the leveling foot.
7. Shrink wrap the machine and the accessories.
➢
Closing the Crate
1. Slide the front and back panels onto the platform. Secure with hex head bolts. Numbered the
front panel with numbers 1 and 4, back panel with numbers 2 and 3.
2. Place the side panel onto the crate and secure with hex head bolts. Numbered the panel with
numbers 1 and 2.
3. Place the other side panel onto the crate and secure with hex head bolts. Numbered the panel
with numbers 3 and 4. Close the machine ID cover.
4. Cover the crate with a top cover and secure with hex head bolts.
➢
Markings for the Crate
1. Mark the bolts in blue as shown after the crate is ready for shipment.
i
Note:
Ensure that necessary transit securing brackets are fixed to the X and Y axes
before closing the crate and shipping the system
.
Transit securing brackets
Machine ID
Cover
Summary of Contents for SE500ULTRA
Page 1: ...SE500ULTRA Hardware Manual ...
Page 6: ...Contents vi SE500ULTRA Hardware Manual ...
Page 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Page 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Page 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Page 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...