Conveyor Components
13. Align to a gap of 5 mm between the stop spacer and the top cap. Tighten the wing nut at
6kgf.
Figure 80.
Gap between stop spacer and Top cap
Figure 81.
Relocation of mechanical board stop completed
14. Tidy the cable routing with cable tie onto the cable mount.
Figure 82.
Cable Routings
15. Reset the conveyor offset after the relocation of the mechanical board stop is completed. For
more information, refer to the section “
To reset the conveyor offset settings
Top Cap
Stop spacer