Chapter 2
:
Installation
26
SE500
ULTRA
Hardware Manual
8. Lower the leveling feet sufficiently to allow the forks of a pallet jack or a forklift under the
machine.
9. Using a pallet jack or forklift, move the machine to a desired location.
10. Remove all the transit securing brackets on X and Y axes before using the machine.
Figure 10.
Transit securing brackets on X-Axis
Figure 11.
Transit securing bracket on Y Axis
Choosing a Location
The SE500
ULTRA
must be level and aligned with incoming and outgoing conveyor sections to
allow for smooth movement of panels.
Choose a location for the SE500
ULTRA
that meets the following requirements:
●
System has easy access to power and compressed air
●
Conveyor is level
●
Conveyor movement is smooth
●
System is not exposed to extreme ambient vibration
Summary of Contents for SE500ULTRA
Page 1: ...SE500ULTRA Hardware Manual ...
Page 6: ...Contents vi SE500ULTRA Hardware Manual ...
Page 10: ...x SE500ULTRA Hardware Manual This page is intentionally left blank ...
Page 28: ...Chapter 1 System Overview 18 SE500ULTRA Hardware Manual Dimensions Figure 8 Front View ...
Page 30: ...Chapter 1 System Overview 20 SE500ULTRA Hardware Manual ...
Page 184: ...Chapter 5 System Drawings 174 CyberOptics Corporation ...