
AIR CONDITIONING
1B-27
Fig. 7 8 --Insta lling R oto r and B e a rin g Puller
Fig. 8 0 -- B e a r in g Sta k e L o c a ti o n s
CLUTCH ROTOR BEARING REPLACEMENT
Removal
1. Perform "Com pressor Clutch R otor and Bearing
Assembly Removal" and remove the pulley rim m ounting
screws as described in Step 2.
2. Place rotor and bearing assembly on blocks (Fig. 81)
and drive bearing out of rotor hub with rotor bearing
remover and rotor assembly installer J-25029. It will not be
necessary to remove the staking at the rear of the rotor hub
to remove the bearing. See Figure 80.
J -25 0 3 1-2
BEARING STAKE LOCATIONS
J -2 5 0 2 9
Fig. 81--Removing Clutch Rotor Bearing
Fig. 7 9 -C lu tc h Coil and Housing Assem bly
Summary of Contents for 1977 10 Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 6: ......
Page 42: ......
Page 65: ...STEERING 3B 23 Fig 3B 65 M easure Back and Remark Housing Fig 3B 67 Tighten Lock Nut...
Page 86: ...4B 14 OVERHAUL MANUAL Fig 4B 28 Gear Teeth C ontact Pattern Check...
Page 125: ...REAR AXLE DIFFERENTIAL 4B 53 Fig 18E Gear Teeth Contact Pattern Check...
Page 156: ......
Page 164: ...4C 8 OVERHAUL MANUAL Fig 4C 12 Gear Tooth Pattern Contact Pattern...
Page 166: ......
Page 194: ......
Page 284: ......
Page 320: ......
Page 322: ...400 7A 2 OVERHAUL MANUAL Fig 7A 1C Side Cross Section Typical...
Page 444: ...7B 64 OVERHAUL MANUAL Fig 7B 11S M od el 2 03 Transfer Case Exploded V iew...
Page 458: ......
Page 466: ......
Page 467: ......
Page 468: ......