Qualification Schedule | 149
Qualification Schedule
The following schedule defines the factory-recommended intervals for verification
tests for an instrument used two to five days a week. The schedule assumes that
the 405 LS is properly maintained as outlined in the
Recommended Maintenance
Schedule on page 119
.
n
Note:
An instrument qualification package (PN 1170543) is available for
purchase. The package contains thorough procedures for performing
Installation Qualification, Operational Qualification and Performance
Qualification (IQ-OQ-PQ) and preventative maintenance (PM). Extensive
Checklists and Logbooks are included for recording results. Contact your local
dealer for more information.
Tests
IQ
OQ
PQ
Initially
Annually
Monthly
Unpacking, Installation, and Setup
ü
Enable/Test System Sensors
ü
ü
System Self Test and Checksum
Test
ü
ü
ü
Shake Test
ü
Ultrasonic Cleaner Test
ü
Washer Evacuation Efficiency Test
ü
ü
Washer Dispense Precision Test
ü
ü
Vacuum Filtration Evacuation Test
ü
ü
Buffer Switching Dispense Test
ü
Verify™ Sensor Test
ü
Run Assay
ü
n
Important!
The risk factors associated with your assays may require that the
Operational and Performance Qualification procedures be performed more or
less frequently than shown above.
System Self-Test, Verify Information
Perform these steps to verify software information and run a system self-check:
BioTek Instruments, Inc.
Summary of Contents for 405 LS
Page 1: ...Operator s Manual Microplate Washer 405 LS ...
Page 2: ......
Page 56: ...36 Chapter 2 Installation 405 Microplate Washer LS ...
Page 134: ...114 Chapter 3 Operation 405 Microplate Washer LS ...
Page 190: ...170 Chapter 5 Qualification 405 Microplate Washer LS ...
Page 210: ...190 Chapter 7 Troubleshooting 405 Microplate Washer LS ...
Page 238: ......