![Agilent Technologies B1542A User Manual Download Page 70](http://html.mh-extra.com/html/agilent-technologies/b1542a/b1542a_user-manual_2868004070.webp)
4- 6
Agilent B1542A User’s Guide, Edition 4
Performing Measurement
Before Measurement
Before Measurement
Confirm or perform the followings before starting measurement.
1. Performing system reset
Perform system reset. See “Performing System Reset” on page 4-7.
2. Deciding device delay time
This is needed to set the DeviceDelay value of the Device Parameters on the
pulsed IV test setup screen.
Connect the device under test (MOSFET) to the pulsed IV test system as shown
in “RF Probes” on page 2-4, and measure the delay time between the gate
monitor pulse and the drain monitor pulse by using the oscilloscope. Then
decide the device delay time shown in Figure 4-3.
3. DcSwitch value on Extended Setup dialog box of pulsed IV test setup
•
Yes for the DC + pulsed IV test system or the option B1542A-024
•
No for the pulsed IV test system
4. SWAddress value on Extended Setup dialog box of pulsed IV test setup
•
GPIB address of 11713A for the DC + pulsed IV test system or the option
B1542A-024
•
any value is ok for the pulsed IV test system
Figure 4-3
Device Delay Time
*DWHPRQLWRUSXOVH
'UDLQPRQLWRUSXOVH
*DWHPRQLWRUSXOVH
'UDLQPRQLWRUSXOVH
'HYLFH'HOD\
%HIRUHDGMXVWPHQW
$IWHUDGMXVWPHQW
Summary of Contents for B1542A
Page 1: ...Agilent Technologies Agilent B1542A Pulsed IV Package for B1500A EasyEXPERT User s Guide ...
Page 9: ...1 Introduction ...
Page 20: ...1 12 Agilent B1542A User s Guide Edition 4 Introduction Accessories and Options ...
Page 21: ...2 Installation ...
Page 49: ...3 Performing System Setup and Compensation ...
Page 65: ...4 Performing Measurement ...
Page 79: ...5 PLSDIV Test Definitions ...
Page 115: ...6 PLSDIV TIS Commands ...
Page 139: ...7 Status Code and Error Messages ...