
1120
Valve Box
Installing the valve box
6 of 10
Jun 2001
Valves
Agilent 6890 Gas Chromatograph Service Manual
Figure 1120-7
Assembling the valve box top
12. While wearing a pair of protective gloves and holding the valve box top
over a waste receptacle, punch or cut out the insulation from the
appropriate holes.
13. Use two Torx T-20 screws to secure the valve box top over the installed
valves, making sure the heater/sensor leads are routed under the
appropriate cutout(s).
Make sure the valve box top is oriented correctly with holes punched out
over the installed valves.
Retainer plate
Insulation
Valve box top
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......