
1120
Valve Box
Installing the valve box
4 of 10
Jun 2001
Valves
Agilent 6890 Gas Chromatograph Service Manual
7.
Insert the valve(s) into the appropriate hole(s) in the heater block and
secure each valve with two long Torx T-10 screws.
Figure 1120-5
Installing valves
8.
Plumb the valves in the appropriate configuration. A variety of valve
configurations are diagrammed in the
Typical Valve Configurations
section in this chapter.
9.
Orient all of the valves in the OFF (CCW) position.
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......