
210
Split/Splitless Inlet
Leak testing—EPC and manual inlets
24 of 30
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Performing the leak test—manual inlets
Note
Be sure to complete all of the preparation steps on pages 18 and 19 before
continuing.
1.
Turn the Total Flow controller counter-clockwise to obtain
approximately 60 mL/min. flow at the split vent. Use a flow meter to
verify this flow rate.
2.
Turn the column head pressure controller clockwise until the column
head pressure reaches 25 psi.
Figure 210-15
Manual flow panel
3.
Wait approximately 15 seconds for equilibration.
If pressure cannot be achieved, either a very large leak is present in the
system, or the supply pressure is not high enough.
4.
Shut off the flow controller by turning it fully clockwise. Do not
overtighten. Use a flow meter to verify that the split flow is off.
Column head
pressure controller
Flow controller
Septum purge vent
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......