
19 of 46
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Programmed Temperature Vaporization Inlet (PTV)
240
Replacement procedures
Figure 240-13
Removing the inlet cryo assembly
4.
Install the new cryo assembly over the inlet body. Be sure to align the
assembly so that the fitting is closest to the wires, as shown in
5.
Reassemble in reverse order.
6.
Check for leaks.
Replacing the PTV manifold assembly
The PTV manifold assembly is available as a replacement part with or without
the connected plumbing. When replacing just the manifold, the plumbing is
removed at the manifold outlet block. When replacing the plumbing and
manifold, the plumbing is disconnected from the inlet.
PTV inlet
Inlet cryo assembly
Remove screws
PTV inlet with cooling
assembly
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......