6 - WORKING OPERATIONS
14. Assemble the two anchor cables
(1)
around the pul-
leys
(2)
under the tunnel. Be sure to reassemble the
retainer pins
(3)
next to the pulleys. Position the ca-
bles out through the opening in the cable guides
(4)
inside the tunnel at the outer edge. Assemble the bolt
(5)
holding the anchor support with rollers
(6)
to the
tunnel Tighten securely.
RAIL16GEN0091AA
45
RAIL16GEN0090AA
46
15. Reassemble the anchor cables
(1)
to the anchors
(2)
by inserting the cable up through the anchor and se-
curing the cable to the anchor with the two piece ca-
ble retainers
(3)
. Place a retainer on top side of the
anchor and secure in place with the saved hardware.
Tighten securely. Pull the cable down through the
anchor and assemble the second two piece retainer
tight against the anchor. Secure in place with hard-
ware saved.
RAIL16GEN0089AA
47
16. Remove the overhead crane from the flip up loop at
the top of the tunnel. Be sure to flip the loop down
before operating.
Use the bag boom
(1)
to reassemble the tunnel ex-
tension
(2)
to the tunnel. Flip the tunnel extension
lifting loop
(3)
up to assemble the bag boom cable.
Be sure to flip the lifting loop down before operating.
RAIL16GEN0119AA
48
6-18
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...