6 - WORKING OPERATIONS
3.
Position the right side tunnel mount
(2)
on the cab end of the tunnel, with the narrow lip between the tunnel tubes
and the other mounting lip pointing away from the tunnel.
4.
Secure the mount to the tunnel with a mount backing bar with nuts
(4)
positioned on the inside surface of the
tunnel. Secure the mount to the tunnel with 5/8-11 x 2 bolts and 5/8 SAE flat washers.
(5)
5.
Secure the left side tunnel mount
(3)
to the engine end of the tunnel in the same manner.
6.
Lift the tunnel up with the overhead hoist and position on the bagger frame.
7.
Insert the threaded tunnel bottom mounting plates
(6)
into the pockets in the frame.
8.
Lower the tunnel down and line up the holes in the mounting brackets
(7)
on each end of the tunnel with the
threaded holes in the tunnel mount plates.
9.
Insert the 5/8-11 x 2 bolts with 5/8 SAE flat washers
(8)
through the bracket and into the threaded holes. Tighten
securely.
10. Assemble the 5/8-11 x 1-1/2 hex head bolts and the 5/8-11 x 2 socket head screws to the cab end and engine
end frame mounting plates. Secure in place with 5/8-11 nylon lock flange nuts. The outer mounting holes from
the 14 ft tunnel to the frame will not be used for the 12 ft tunnel.
11. Assemble the tunnel support weldment plates between the left and right tunnel mounts and the corresponding
holes in the frame of the bagger on the engine and cab ends. Use 5/8-11 x 1-1/2 hex bolts 5/8-11 nylon lock
flange nuts to secure the weldments to the tunnel mounts and the frame. On the cab end of the tunnel, also
assemble the anchor indicator cable roller to the lower bolt of the tunnel mount. Tighten securely.
12. Assemble the tunnel support weldment plates between the left and right tunnel mounts and the corresponding
holes in the frame of the bagger on the engine and cab ends. Use 5/8-11 x 1-1/2 hex bolts 5/8-11 nylon lock
flange nuts to secure the weldments to the tunnel mounts and the frame. On the cab end of the tunnel, also
assemble the anchor indicator cable roller to the lower bolt of the tunnel mount. Tighten securely.
RAIL16GEN0271FA
2
6-5
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...