6 - WORKING OPERATIONS
10. Remove the seven 3/4” bolts
(1)
from under the tun-
nel. These bolts hold the tunnel to the frame. Three
are on the cab end of the tunnel and four
(2)
are on
the engine end of the tunnel. Save the hardware for
reassembly
RAIL16GEN0093AA
21
RAIL16GEN0091AA
22
11. Remove the guard
(1)
from the planetary end of the
rotor on the feed table side. This is to access the
three allen flat head bolts
(2)
(inline with the rotor) that
hold the tunnel to the frame. Remove all three bolts.
Save all hardware for reassembly. Early production
had flat head bolts, current production has hex head
bolts.
RAIL16GEN0095AA
23
RAIL16GEN0096AA
24
6-11
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...