6 - WORKING OPERATIONS
3. Line up the five holes in the engine side support plate
(1)
with the five holes in the frame
(2)
. Secure in place
with the hardware
(3)
saved from removal. Tighten
securely. Tighten the four bolts
(4)
on the other end of
the support plate.
RAIL16GEN0103AA
33
4. Line up the five holes in the cab side support plate
(1)
with the five holes in the frame
(2)
. Secure in place
with the hardware
(3)
saved from removal. Tighten
securely. Tighten the four bolts
(4)
on the other end of
the support plate.
RAIL16GEN0102AA
34
5. Identify and assemble the two quick disconnect hoses
from the “A”
(1)
& “B”
(2)
ports on the valve block
(3)
mounted to the tunnel on the feed table side just in
front of the cab. The valve and hoses from the “C”
& “D” ports had remained with the tunnel. Valve block
shown is on a
12 ft
tunnel, valve & hoses are the same
as a
14 ft
tunnel, just mounted different.
RAIL16GEN0101AA
35
6. Assemble the wire harness
(1)
to the limit switch
(2)
located on the tunnel side behind the clean out plate.
Securely fasten the harness to the switch.
RAIL16GEN0100AA
36
6-15
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...